ED-243C Ch.1

ED-243C Ch.1 | MOPS for Avionics Supporting Next Generation Satellite Systems (NGSS)

WG-82
Space
September 2022

Several issues have been identified that will require Change 1 documentation to the existing Appendix F Iridium Certus MOPS: 1.Changes to Section F.2.3.5 for Lightning Induced Transient Testing required in DO-160 – missing note and table F-32 update 2.Changes to Receiver Susceptibility requirements and test (Section F.2.2.3.1.3.2.6. and F.2.4.3.1.2.2.6) 3.Changes to Harmonic, Spurious and Noise Requirements Table F-18 and associated Notes. (Section F.2.2.3.1.3.1.4). 4.Changes to fmax/fmin frequency range calculation in Section F.2.4.3.1.2.1.4 5.Changes to fmax/fmin frequency range calculation in Section F.2.4.3.1.2.1.8 6.Change to Rejection of Signals Outside the NGSS Receive Band (F.2.2.3.1.3.2.3) 7.Changes to Receiver Operation in Moving Aircraft requirement (Section F.2.2.3.1.3.2.5) 8.Changes to Receiver Operation in Moving Aircraft Test (Section F.2.4.3.1.2.2.5) 9.Change in Transmitter Operation in Moving Aircraft Requirement (Section F.2.2.3.1.3.1.9) 10.Change in Transmitter Operation in Moving Aircraft Test (F.2.4.3.1.2.1.9) 11.Change in Error Vector Magnitude Requirement (F.2.2.3.1.3.1.10)

For Non-Members
30 €
For Limited Members
21 €
For Full Members
0 €
ED-57A
August 21, 2026
latest
ER-018
July 10, 2018
latest
ER-020
November 18, 2019
latest
ER-006
July 2, 2015
historical
ER-017
June 24, 2018
latest
ER-016
March 20, 2018
latest